Project Timeline & Milestones

 

Milestone

Month

MS1

User Studies

12

MS2

MIRROR Framework and Prototype Version 1

24

MS3

MIRROR Framework and Prototype Version 2

36

MS4

MIRROR Framework, Prototype Version 3 and Summative Evaluation

48

MS5

Community Workshop and Dissemination Plan

24

MS6

Final Exploitation Plan

48

 

User studies (MS1): integratively describes the results of the diverse user studies and in-depth case studies for MIRROR AppShere; WPs 3-8 contribute with an own deliverable to this milestone. The methodology and the integration of these deliverables is performed in WP1.


MIRROR Framework and Prototype (MS2-4): integratively describes the results of the conceptual work done within work packages WP1-8, specifically it will contain the integrated conceptual model of learning by reflection. The AppSphere Prototype provides an integrated prototype of the MIRROR AppSphere including all MIRROR Apps which have been developed up to this point in time. Three iterative versions of this prototype will be submitted acknowledging the agile development approach taken. During the second and third year formative evaluation at the test beds supply the WPs 1-3 with the requirements for developing their Apps. In the last year, a formative evaluation determines the degree of learning effectiveness reached with the MIRROR Apps.

The strength of combining these deliverables is that the work packages from WP1 to WP8 have to work deeply together. Surely, each work package has its own section in each deliverable where the work packages leaders are responsible for, but the main goal is to support the holistic view of MIRROR as a whole. Additionally this structure of this deliverable creation process ensures that the work packages work closely related.

 

 